UPDATE active work zones for Richmond Forcemain project

posted Dec 18, 2017, 6:44 AM by St. Philip School

The active work zones are located at:

  • the Pumping Station located at Royal York Street and Cockburn Street adjacent to the Conservation Area and  
  • along the north perimeter of Lagoon Cell ‘C’ (Lagoon nearest to the Jock River) along the Jock River.   

 

See sketch below which illustrates the construction zone, work zones (restricted areas) and accessible areas.  The overall construction site is indicated by the hatched lines. The active work zones, shown in red are restricted.  The areas shown in green are accessible and open to use.  It should be noted that there are permanent concrete maintenance hole structures that are above the surface of the ground (approximately 1 to 2 feet high) in the green area that may be covered in snow. Also, the lagoon Cell ‘C’ which will be filled and drained intermittently during the course of the work.

 

Please avoid above-mentioned locations until the Summer of 2018, when the project will be completed.